Product View > Grade 80 Alloy Fittings > Pear Round & Triangle Rings >

Pear Link,Grade 40 Carbon Steel Forged, Toolee

Pear Link,Grade 40 Carbon Steel Forged, Toolee
Pear Link,Grade 40 Carbon Steel Forged, Toolee
Inquiry Now
Quick Search:  pear link    forged pear link            

 

Grade 40 Carbon Steel Forged Pear Shape Link, Toolee Made

Size & Capacity: 3/8" WLL:1600LBS, 1/2" WLL: 2900LBS, 5/8" WLL:4200LBS, 3/4" WLL:6000LBS, 7/8" WLL:8300LBS, 1" WLL:10800LBS, 1-1/8" WLL:12000LBS, 1-1/4" WLL:18750LBS, 1-3/8" WLL:20500LBS, 1-1/2" WLL:25000LBS.
 
Material &Process: Carbon Steel, Drop Forged. Heat Treated.
 
Class or Grade: Grade 80
 
Certificate: ISO90001, Breaking Load test Certificate.
 
Finished: Powder Coated or painted or Customers
 
Packing: In Carton and then on pallets, Every PC with Individul strong plastic bags
 
Minimum Order Quantity: 200pcs for one batch for one size.
 
 
Item No.          Made by Toolee
WLL
(LBS)
SIZE
WEIGHT    (KG)
A
B
C
D
TL4PSL10
1800
3/8"
0.1
10
28.5
19
10
TL4PSL13
2900
1/2"
0.25
12.5
38
25.5
12.5
TL4PSL16
4200
5/8"
0.5
16
47.5
32
16
TL4PSL19
6000
3/4"
0.8
19
57
38
19
TL4PSL22
8300
7/8"
1.4
22
67
44.5
22
TL4PSL25
10800
1"
1.9
25
76
51
25
TL4PSL28
12000
1-1/8"
2.92
28
86
57
28
TL4PSL32
16750
1-/4"
3.75
32
95
63.5
32
TL4PSL35
20500
1-3/8"
5.12
35
105
70
35
TL4PSL38
25000
1-1/2"
6.5
38
114
76
38

 

{$Application$}

Supply information:


Price: Currently the main Reason concerning the Price is the Raw Material, Exchange Rate, and Labour Cost. Of course, Large Quatity we offer a Better Price. Please noted: Never Confirm the order Before we give you the confirmation if we offered you the price beyond 30 days.
Quality: Meet the standard of EN818-2, ASTM, ISO, American Standard, European Standard, EN12195-1/2.

Lead time: 30-60 days mainly according What item and how many quantities. Quantity: We don't accept small Quantity with total value under USD5000.00.(Long time Cooperation can be accepted with few items)
Packing: Cartons Bags/Gunny Bags/Plastic Reel/Wooden Reel and Then on Pallets into Container. All for Sea-Transport.

Payment: T/T(Wire Transfer) or L/C at sight, Usually for First time we need about 30% as deposit, For Long time Cooperation, let's disccuss based on Win2Win.
 

TOOLEE Special Items: (5 Series)

Series 1)
Lifting Chain and Components.
Series 2)Lashing Chain and FittingsRatchet Tie Down.
Series 3) Chain & Wire Rope & Rigging Accessories
Series 4)Soft Polyester Sling: Webbing Sling, Round Sling,
Series 5) Stainless Marine Hardware