Product View > Grade 80 Alloy Fittings > Master Link & Sub-Assemblies >

Master Link Assembly, G806, TOOLEE Made

Master Link Assembly, G806, TOOLEE Made
Master Link Assembly, G806, TOOLEE Made
Inquiry Now
Quick Search:  Assembly    Link Assembly    Msater Assembly G806 Assembly                

 

Master Link Assembly,G806,TOOLEE Made

Size & Capacity: Working load with 3.1ton, 4.6 ton, 7.8 ton, 14 ton, 24.8 ton,33.3 ton, 37.1 ton, 50 ton,74.8 ton.
 
Material &Process: Alloy steel, Drop Forged. Heat Treated.
 
Class or Grade: Grade 80
 
Safety Factor: 4:1
 
Certificate: ISO90001, Breaking Load test Certificate.
 
Finished: Powder Coated or painted or Customers
 
Packing: In Carton and then on pallets, Every PC with Individul strong plastic bags
 
Minimum Order Quantity: 200pcs for one batch for one size or others quantity as agreement.
 
Item No.
Made by TOOLEE
SIZE
WEIGHT
/kg
WLL/T
B.L/T
A
B
D
a
   b
d
TL8MLA60006
0006
0.6
3.1
12.4
130
60
14
30
16
10
TL8MLA60708
0708
1.6
4.6
18.4
160
90
20
60
35
13
TL8MLA60010
0010
3.08
7.8
31.2
195
110
25
80
40
16
TL8MLA60013
0013
6.5
14
56
240
140
32
90
50
22
TL8MLA60016
0016
11.6
24.8
99.2
270
140
40
100
60
28
TL8MLA61820
1820
17
33.3
133.2
300
155
45
180
100
32
TL8MLA60022
0022
26.4
37.1
148.4
350
190
50
180
100
40
TL8MLA60026
0026
42.3
50
200
410
220
60
200
110
45
TL8MLA60032
0032
61
74.8
299.2
420
250
70
200
110
50
 

{$Application$}

Supply information:


Price: Currently the main Reason concerning the Price is the Raw Material, Exchange Rate, and Labour Cost. Of course, Large Quatity we offer a Better Price. Please noted: Never Confirm the order Before we give you the confirmation if we offered you the price beyond 30 days.
Quality: Meet the standard of EN818-2, ASTM, ISO, American Standard, European Standard, EN12195-1/2.

Lead time: 30-60 days mainly according What item and how many quantities. Quantity: We don't accept small Quantity with total value under USD5000.00.(Long time Cooperation can be accepted with few items)
Packing: Cartons Bags/Gunny Bags/Plastic Reel/Wooden Reel and Then on Pallets into Container. All for Sea-Transport.

Payment: T/T(Wire Transfer) or L/C at sight, Usually for First time we need about 30% as deposit, For Long time Cooperation, let's disccuss based on Win2Win.
 

TOOLEE Special Items: (5 Series)

Series 1)
Lifting Chain and Components.
Series 2)Lashing Chain and FittingsRatchet Tie Down.
Series 3) Chain & Wire Rope & Rigging Accessories
Series 4)Soft Polyester Sling: Webbing Sling, Round Sling,
Series 5) Stainless Marine Hardware