Product View > Grade 80 Alloy Fittings > Master Link & Sub-Assemblies >

Master Link Assembly, G807, TOOLEE Made

Master Link Assembly, G807, TOOLEE Made
Master Link Assembly, G807, TOOLEE Made
Inquiry Now
Quick Search:  Assembly    Link Assembly    Msater Assembly G807 Assembly                    

 

Master Link Assembly,G807,TOOLEE Made

Size & Capacity: Working load with 4.6ton, 8.6 ton, 14.5 ton, 23.1 ton, 29 ton,36.5 ton, 45.2 ton, 59.9 ton,84.7 ton.
 
Material &Process: Alloy steel, Drop Forged. Heat Treated.
 
Class or Grade: Grade 80
 
Safety Factor: 4:1
 
Certificate: ISO90001, Breaking Load test Certificate.
 
Finished: Powder Coated or painted or Customers
 
Packing: In Carton and then on pallets, Every PC with Individul strong plastic bags
 
Minimum Order Quantity: 200pcs for one batch for one size or others quantity as agreement.
 
 
 
Item No.
Made by TOOLEE
SIZE
WEIGHT
/kg
WLL/T
B.L/T
A
B
D
a
   b
d
TL8MLA70006
0006
1.43
4.6
18.4
120
61
16
120
60
14
TL8MLA70708
0708
3.65
       8.6
34.4
162
90
22
140
70
20
TL8MLA70010
0010
5.53
 14.5
58
200
110
28
140
70
22
TL8MLA70013
0013
11.92
 23.1
.      92.4
270
140
36
185
90
28
TL8MLA70016
0016
16.4
29
116
280
190
40
200
110
32
TL8MLA71820
1820
23.5
 36.5
146
320
175
45
225
125
36
TL8MLA70022
0022
32.3
 45.2
  180.8
350
195
50
260
130
40
TL8MLA70026
0026
59.3
 59.9
      239.6
410
220
58
350
195
50
TL8MLA70032
0032
97.4
 84.7
      338.8
490
265
70
110
220
58
 

{$Application$}

Supply information:


Price: Currently the main Reason concerning the Price is the Raw Material, Exchange Rate, and Labour Cost. Of course, Large Quatity we offer a Better Price. Please noted: Never Confirm the order Before we give you the confirmation if we offered you the price beyond 30 days.
Quality: Meet the standard of EN818-2, ASTM, ISO, American Standard, European Standard, EN12195-1/2.

Lead time: 30-60 days mainly according What item and how many quantities. Quantity: We don't accept small Quantity with total value under USD5000.00.(Long time Cooperation can be accepted with few items)
Packing: Cartons Bags/Gunny Bags/Plastic Reel/Wooden Reel and Then on Pallets into Container. All for Sea-Transport.

Payment: T/T(Wire Transfer) or L/C at sight, Usually for First time we need about 30% as deposit, For Long time Cooperation, let's disccuss based on Win2Win.
 

TOOLEE Special Items: (5 Series)

Series 1)
Lifting Chain and Components.
Series 2)Lashing Chain and FittingsRatchet Tie Down.
Series 3) Chain & Wire Rope & Rigging Accessories
Series 4)Soft Polyester Sling: Webbing Sling, Round Sling,
Series 5) Stainless Marine Hardware