Product View > Grade 80 Alloy Fittings > Master Link & Sub-Assemblies >

Master Link Assembly, MTC Light

Master Link Assembly, MTC Light
Master Link Assembly, MTC Light
Inquiry Now
Quick Search:  master link Assembly. mtc master link        

 

Master Link Assembly, MTC Light

Size & Capacity: size 6mm, 8mm, 10mm, 13mm, 16mm, 19mm, 20mm, 22mm, 26mm, 28mm, 32mm.
 
Material &Process: Alloy steel, Drop Forged. Heat Treated.
 
Class or Grade: Grade 80
 
Certificate: ISO90001, Breaking Load test Certificate.
 
Finished: Powder Coated or painted or Customers
 
Packing: In Carton and then on pallets, Every PC with Individul strong plastic bags
 
Minimum Order Quantity: 200pcs for one batch for one size or others quantity as agreement.
 
Item No.
SIZE(MM)
WEIGHT
/kg
WLL/T
B.L./T
a
b
d
D
A
B
TL8MLSTCL06
6
1.45
2.3
11.5
60
38
13
19
150
90
TL8MLSTCL08
8
2.24
4.25
21.25
70
46
16
22
160
95
TL8MLSTCL10
10
4.88
6.7
33.5
90
60
19
30
200
120
TL8MLSTCL13
13
8.66
11.2
56
140
65
25
34
240
140
TL8MLSTCL16
16
14.86
17
85
180
100
32
40
250
150
TL8MLSTCL18
18
14.86
17
85
180
100
32
40
250
150
TL8MLSTCL19
19
26
26.8
134
190
110
38
50
300
200
TL8MLSTCL20
20
26
26.8
134
190
110
38
50
300
200
TL8MLSTCL22
22
32.2
31.5
157.5
190
110
40
55
350
200
TL8MLSTCL26
26
39.95
45
225
200
110
45
60
350
200
TL8MLSTCL28
28
39.95
45
225
200
110
45
60
350
200
TL8MLSTCL32
32
63.85
67
335
200
120
50
70
450
250

{$Application$}

Supply information:


Price: Currently the main Reason concerning the Price is the Raw Material, Exchange Rate, and Labour Cost. Of course, Large Quatity we offer a Better Price. Please noted: Never Confirm the order Before we give you the confirmation if we offered you the price beyond 30 days.
Quality: Meet the standard of EN818-2, ASTM, ISO, American Standard, European Standard, EN12195-1/2.

Lead time: 30-60 days mainly according What item and how many quantities. Quantity: We don't accept small Quantity with total value under USD5000.00.(Long time Cooperation can be accepted with few items)
Packing: Cartons Bags/Gunny Bags/Plastic Reel/Wooden Reel and Then on Pallets into Container. All for Sea-Transport.

Payment: T/T(Wire Transfer) or L/C at sight, Usually for First time we need about 30% as deposit, For Long time Cooperation, let's disccuss based on Win2Win.
 

TOOLEE Special Items: (5 Series)

Series 1)
Lifting Chain and Components.
Series 2)Lashing Chain and FittingsRatchet Tie Down.
Series 3) Chain & Wire Rope & Rigging Accessories
Series 4)Soft Polyester Sling: Webbing Sling, Round Sling,
Series 5) Stainless Marine Hardware