Product View > Grade 80 Alloy Fittings > Master Link & Sub-Assemblies >

G80 Master Link, G803, TOOLEE Made

G80 Master Link, G803, TOOLEE Made
G80 Master Link, G803, TOOLEE Made
Inquiry Now
Quick Search:  master link    forged master link            

 

G80 Master Link ,G803,TOOLEE Made

Size & Capacity: Working load with 1.2ton, 1.4 ton, 2.1 ton, 3.2 ton, 4.7ton,5.4 ton, 8.2 ton, 12.8 ton, 16 ton, 21.2 ton, 32.8 ton.
 
Material &Process: Alloy steel, Drop Forged. Heat Treated.
 
Class or Grade: Grade 80
 
Safety Factor: 4:1
 
Certificate: ISO90001, Breaking Load test Certificate.
 
Finished: Powder Coated or painted or Customers
 
Packing: In Carton and then on pallets, Every PC with Individul strong plastic bags
 
Minimum Order Quantity: 200pcs for one batch for one size or others quantity as agreement.
 
Item No.
Made by TOOLEE
SIZE
WEIGHT
/kg
WLL/T
B.L/T
A
B
D
S
TL8MLM11
11
0.22
1.2
4.8
90
65
11
10
TL8MLM13
13
0.36
         1.4
5.6
110
75
13
10
TL8MLM16
16
0.61
2.1
8.4
120
85
16
14
TL8MLM18
18
0.87
3.2
        12.8
135
95
18
14
TL8MLM20
20
1.1
4.7
        18.8
135
95
20
14
TL8MLM22
23
1.69
5.4
        21.6
160
110
23
17
TL8MLM26
27
2.64
8.2
        32.8
180
125
27
20
TL8MLM32
33
4.76
12.8
        51.2
220
145
33
26
TL8MLM36
40
8.34
16
        64
260
175
40
29
TL8MLM45
45
12.4
21.2
        84.8
300
220
45
45
TL8MLM50
60
26
32.8
        131.2
350
250
60
60

{$Application$}

Supply information:


Price: Currently the main Reason concerning the Price is the Raw Material, Exchange Rate, and Labour Cost. Of course, Large Quatity we offer a Better Price. Please noted: Never Confirm the order Before we give you the confirmation if we offered you the price beyond 30 days.
Quality: Meet the standard of EN818-2, ASTM, ISO, American Standard, European Standard, EN12195-1/2.

Lead time: 30-60 days mainly according What item and how many quantities. Quantity: We don't accept small Quantity with total value under USD5000.00.(Long time Cooperation can be accepted with few items)
Packing: Cartons Bags/Gunny Bags/Plastic Reel/Wooden Reel and Then on Pallets into Container. All for Sea-Transport.

Payment: T/T(Wire Transfer) or L/C at sight, Usually for First time we need about 30% as deposit, For Long time Cooperation, let's disccuss based on Win2Win.
 

TOOLEE Special Items: (5 Series)

Series 1)
Lifting Chain and Components.
Series 2)Lashing Chain and FittingsRatchet Tie Down.
Series 3) Chain & Wire Rope & Rigging Accessories
Series 4)Soft Polyester Sling: Webbing Sling, Round Sling,
Series 5) Stainless Marine Hardware